Description
Discover how we addressed design collaboration and seamless coordination among numerous designers and contractors in the world's longest immersed tunnel. During the basic design, 700+ models were created in Revit software to define complex elements like fire safety, lighting, ventilation, electrical, and ICA systems. To expedite progress, we implemented automations with Dynamo to swiftly model repetitive elements along the tunnel alignments. This helped us achieve a 70% time reduction in modeling and production costs. Real-time interdisciplinary collaboration was vital, along with streamlining information exchange, which Autodesk Construction Cloud facilitated as the ultimate source of truth for the 30 members involved in developing cloud-based models. IDOM dives into the details of the Fehmarnbelt Fixed Link project during the session, seeking to inspire others by showcasing the remarkable engineering feats and collaborative efforts on a global scale.
Key Learnings
- Gain a greater understanding of the connection between desktop and cloud solutions at a design level.
- Learn how to apply automation within Dynamo scripts for the modeling of complex design elements in Revit, saving production time.
- Learn how to implement the right CDE, get models coordinated, and enhance design collaboration among different teams.